<p>Is there any way, in Vivado, to do &quot;ex post facto timing analysis&quot;?</p><p>In other words, can I take a post P&amp;R design, write a new timing constraint, and (without attempting to change the existing design to meet it) get a timing report with the new constraint applied so I can see how far off I had been?</p>
Reply